Friday 6 August 2010

Framing going up

Started installing the framing for the false walls.


Borrowed a mitre-saw from my brother, it's handy, but the calibration is out- the 0degree detent is slightly skew.

Things are being complicated slightly by the fact that the front bedroom is being used to store all the fiberglass loft insulation. I've no idea what to do with it right now, there's tons of it, so I've just dumped it where there's space- the same room I'm trying to build a wall.

Also got the boiler going in this week, though it won't be working until the gas supply is connected up, and that's not til the 19th Aug.